Soling work specification
WebAll works upto floor V level. Cum 216.00 10.0 Centering & shuttering including Strutting, Propping & removal of forms for : (Refer to Specification) a) Foundations, Footings, Bases for columns Sqm 150.00 b) Vertical surfaces such as retaining walls, return walls, Partitions, walls (any thickness) including attached Pilasters, WebA-1.2 Brick Soling, Mass Concrete, Polythene Sheet 5 One layer of brick flat soling in foundation or in floor or where necessary with 1st class or picked jhama bricks including preparation of bed and filling the interstices with local sand, levelling etc. all complete as per specification, drawing and accepted by the Engineer. sqm 947.00 - 6
Soling work specification
Did you know?
Web1.4 Rubble soling 0 a) P/L 300mm thick rubble soling in two layers 150mm each over fully compacted subbase incuding stone packing hand-set with broader side flat, filling voids … WebExcavation. Foundation trenches shall be dug out to the exact width of foundation concrete. Sides of foundation shall be vertical. If the soil is not good and does not permit vertical sides, the sides should be sloped back or protected with timber shoring. Excavated earth shall not be placed within 1 meter (3 feet) of the edge of the trench.
WebName of Work: Improvement Works on Mathanguri-Panbang Road(in between 0-13km in stretches). Sub Head: Construction of L-Drain, Box drain, RCC culvert & widening. a Construction of L-Drain( at 7 to 9km ) in stretches Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, anddepth > 300 mm including
Web(e) Moisture Contents: One test for every 250 cu.m of soil. Measurement: The filling shall be measured and quantity of earthwork computed from cross-sections of filling or the embankment. No deduction shall be made for voids. Rate: The rate shall include the testing, additional rolling to obtain required density in addition to the cost of materials and WebA SPECIFICATION FOR CIVIL WORK 1. EARTH WORK 1.1. SCOPE OF WORK: The scope of work covered under this specifications pertains to excavation of foundations, trenches, pits and over areas, in all sorts of soils, soft and hard rock, correct to dimensions given in the drawing including shoring, protections of existing
Webinstallation and provisioning etc. The work is to be completed as per manufacturer’s specification . 110 SqM 1000 110000 2 Partitions : i) Rate to be included of all kinds of planes/levels, profiles and cut outs, etc. required for light fixtures, trap doors and ACs, boards, provision for light fittings and diffusers have to be made at no extra
WebE & P Department , Gresham House-2 1.0 SCOPE The work covered under this specification includes all type of soling work either by rubble stones laid under floors / hard core under … port washington calendarWebfor proper completion of work, finished to required templete as directed by Engineer-in-charge but excluding cost of metal required for rectification of the subgrade. 11 773b same as item no 773(a) but in 1:1.5:3 Cum 7876.00 D:\Office Work\Website\upload\SOR\Azamgarh Circle SOR.xlsRoad WorktChap20m port washington canvasWebnominal size) including water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. R2-CS-CW-2-a-1 Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix from Engineer-in-charge ironing out synonymWeb4. IS: 5779-1986 Specification for burnt clay soling bricks (First revision) 5. IS: 2691-1988 Specification for burnt clay facing bricks (Second revision) 6. IS ... 11. IS: 2212-1991 Brick works – code of practice (First revision) 12. IS: 2222-1991 Specification for burnt clay perforated building bricks (Third revision) port washington camerasWebused for soling for minor roads and for patch repairs. 23.5.5 Laying and Consolidation 23.5.5.1 The sub grade prepared as per specification shall be approved by the Engineer … ironing out the kinksWebEarth work in excavation in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on ... Providing desination 100 A one brick flat soling ... watering texes, roualty all complete as per building specification and direction of E/l. Providing average 150mm thick dry rammed khoa beaten to 112 mm (compacted with water) made of port washington campgroundsWebPlain Cement Concrete (PCC)- Work Procedure. Plain cement concrete is the mixture of cement, fine aggregate (sand) and coarse aggregate without steel. PCC is an important component of a building which is laid on the … port washington cam